Hedcor Projects

2

HEDCOR SIBULAN, INC.

ELECTRICAL PROJECTS

1. Installation of V8-69 Transmission Line Plant A
Kapatagan, Davao del Sur
June 2010

2. Head Pond A Electrical Works
Kapatagan, Davao del Sur
June 2010

3. 69 KV Transmission and Distribution Line Rehabilitation Works at Plant A
Kapatagan, Davao del Sur
February 2011

4. Replacement of PT Phase A and C at Plant B
Sibulan, Sta. Cruz
September 2011

5. Distribution Line Rehab at Tudaya Headpond A (DLA # 40 & 41)
Tudaya, Sta. Cruz
November 2011

6. Relocation of Distribution Line Pole
Tudaya, Sta. Cruz
January 2013

7. Removal and Recovery of Pole,Erection, Energization and Deenergization of Transformer
Astorga, Sta. Cruz
January 2013

8. Dredging Power Supply Plant A
Astorga, Sta. Cruz
August 2013

 

CIVIL WORKS PROJECT

1. Substation A Transformer Rock Protection
Bry. Sibulan, Sta. Cruz
October 2011

2. Plant A Power and Improvement Works
Kapatagan, Sta. Cruz
October 2011

3. Baracatan Access Road Tire Path and Cross Drain, Power Station B Access Road Canal and Cross Drain and the Sibulan Access Road Cross Drain
Sta. Cruz, Davao Del Sur
February 2012

4. Riprapping of Canal along Hedcor Plant B access road and installation of two Cross Drain
Sta. Cruz, Davao Del Sur
March 2012

5. Installation of Cross Drain at access road towards Brgy. Sibulan.
Bry. Sibulan, Sta. Cruz, Davao del Sur
March 2012

6. Staffhouse B Rockfall Fence/ Protection
Sta. Cruz, Davao Del Sur
July 2012

7. Headpond B Access Road Tire Path Conceting from STA 0+185 TO 0+200
Sta. Cruz, Davao Del Sur
August 2012

8Headpond B Access Road Tire Path Conceting from STA 0+185 TO 0+200
Sta. Cruz, Davao Del Sur
August 2012

9. Road Repair at Plant B
Sta. Cruz, Davao Del Sur
November 2012

10. Hedcor Sibulan, Inc. – Main Contractor
4km Access Road Rehab from Baroring to Sitio Live-In
Baroring to Sitio Live-In-Tudaya Brgy. Sibulan, Sta. Cruz, Davao del Sur
May 2016

11. Construction of 300m Canal at sta 0+080 to sta 0+180 and sta 0+240 to sta 0+440
Baroring-Tudaya Brgy. Sibulan, Sta. Cruz, Davao Del Sur
May 2016

12. 200m Access Road Tire-Path at Powerhouse A Access Road
Barangay Tibolo Sta. Cruz Davao Del Sur
May 2016

13. 300m Access Road Concreting at Headpond/Tudaya 1 Powerhouse Access Road
Sitio Baroring Tudaya Barangay Sibulan Sta. Cruz Davao Del Sur
May 2016

14. 300m Road Concreting of Power Station B
Barangay Sibulan Davao Del Sur
2016

15. Access Road Canal 300M Project
2016

16. Restoration of Concrete Pavement, Riprap Wall and Side Ditch Canal Project
2016

17. Restoration of Conveyance Pipe – Civil Works Project
2016

18. 350m Weir 1B Tire Path
2017

19. Power B wall Repainting works
2017

20. 350 meters Weir 1B Tire Path Project
2017

21. Installation of Sand-Bag on Top of Conveyance Line Located at Weir 1B (Maharlika) Project
2017

22. Construction of Cut-off wall with Grounded Riprap
2017

23. Construction of Cut-off wall with Plum Concrete Fill
2017

24. 350M 1B Tirepath Project
2017

25. Construction of 21m Safety Railings
2017

26. Weir 1B Access Road Rehab and Patching w/ Canalization
2017

27. Retrofitting of Baroring Bridge
2017

28. 350 1B tire path project
2017

 

OUTSIDE PLANT ENGINEERING PROJECT

1. FOC 8 core Installation 6km
Sibulan, Darong Davao Del Sur
March 2010

2. FOC 8 core Installation 4km
Kapatagan, Davao Del Sur
April 2010

3. Supply Fiber Optic Cable and 8 Core Splicing
Kapatagan, Davao Del Sur
July 2010

4. Weir 1, Hedpond A to Power House a Fiber Optic Installation
Kapatagan, Davao Del Sur
July 2010

 

MAINTENANCE PROJECTS

Fiber Optic Cable Maintenance
Power House to Head Pond A to B
2018

 

 

HEDCOR BUKIDNON, INC.

ELECTRICAL PROJECTS

1. 13.8KV Manolo Fortich 1 Distribution Line Project
Maluko, Manolo Fortich, Bukidnon 8703
July 2016

2. 13.8KV Manolo Fortich 2 Distribution Line Project
Maluko, Manolo Fortich, Bukidnon 8703
July 2016

3. Manolo Fortich 1 Project Surveillance and Monitoring System Infra
Maluko, Manolo Fortich, Bukidnon 8703
July 2016

4. Manolo Fortich 2 Project Surveillance and Monitoring System Infra
Maluko, Manolo Fortich, Bukidnon 8703
July 2016

 

 

HEDCOR INC.

CIVIL WORKS PROJECT

1. Talomo 2 Power Improvement Works
2015

2. Kilabe Foot Bridge Riprap Construction
2015

3. Temporary Storage Facility for PCB Contaminated Transformer at Talomo 1
2015

4. Talomo Plant 2 Office Restoration
2016

5. Power Plant Improvement Works – Civil Works Project
2016

6. Construction of 0.05m x 1.0m x 100.0m Spillway (Both side)
2017

7. Service Rendered for Contruction of Comfort Room
2017

8. Repair/Renovation of Talomo Plant 3
2017

9. Repair of Spillway Canal at Talomo 2 (Main) HEPP
2017